
Rear additions
A bigger kitchen, family room or main-floor bedroom off the back of the house.
Rear additions, second storeys and rooms over the garage, with the drawings and the Township of Scugog permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately. See the full cost guide.

Going up keeps your yard and can double the bedrooms on the same lot. Before anything is drawn, an engineer checks that the foundation and walls can carry the new floor.
Second storeys fall in the same rough budget as other additions, $300 to $500 per sq ft before HST.
Read the second-storey guideYes. Additions need a building permit from the Township of Scugog, and applications go in through Cloudpermit. Read the full permit guide.
Any addition, including sunrooms. The Township's guide lists structures over 15 m², about 13 x 12 ft.
A Township-approved site plan, construction plans, a lot grading plan and the heating and energy forms.
On septic, the Region of Durham Health Department approves first. On a well, a well report goes in too.
Most of Scugog is in Kawartha Conservation's regulated area. Some lots are under Lake Simcoe or Central Lake Ontario.
Expanding a house by more than 93 m², about 1,001 sq ft, may need site plan approval.
Online through Cloudpermit, or on paper at the Township office on Perry Street.
Rear, side and second-storey additions across the Township of Scugog, in town and on rural and lakeside lots.
The main town on Lake Scugog.
Village just west of Port Perry.
Lakeside community on the east shore of Lake Scugog.
Hamlet in the east of the township.
Yes. The Township of Scugog lists additions and sunrooms as permit work. Applications go in through Cloudpermit.
As a rough budget, $300 to $500 per sq ft before HST. Design and permits are priced separately and quoted after the site visit.
Plan on 2 to 6 months for design and permits, then 5 to 9 months to build, depending on the size, inspections and any changes along the way.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
Often, yes, if the foundation and walls can carry it and the zoning allows the height. An engineer checks the structure before anything is drawn.
Only if the addition doesn't meet the zoning by-law, for example on setbacks, height or lot coverage. That goes to the Committee of Adjustment before the building permit.
The Region of Durham Health Department approves first, and its approval goes in with the building permit application.
A site visit shows what your lot allows and what an addition would involve.